Default Why RSV Need Open When Turbine Reset ?

We Have GE 550MW Steam Turbine With Mark V Contro System,
Would Someone Please Tell Me Why The RSV (Reheat Stop Valve) Should Open When Turbine Reset ?
Thanks!

Last edited by lty2000; 11-30-2010 at 08:56 AM.
Reply With Quote
  #2 (permalink)  
Old 12-04-2010
PPF Member
Power Rookie
 
Join Date: Apr 2009
Location: Maine
Posts: 8
Rep Power: 79
Doug_L is on a distinguished road
Default

It may be because of the size of the unit and the steam pressure supplied. Our unit opens all valves upon reset, this is to verify or ensure proper pressure and flow through the entire unit. With the valves shut or almost shut some sections of the turbine are actually under a vacuum or may have no flow. With no flow windage can occur and heat can increase rapidly, so on your unit it may be just to ensure the unit heats up uniformly. Sometime with hi pressure inlets and low flow the pressure drop can be great. This is just my take on it hope it helps, great question. Doug
Reply With Quote
  #3 (permalink)  
Old 12-19-2010
PPF Member
Power Rookie
 
Join Date: Dec 2010
Location: Egypt
Posts: 40
Rep Power: 56
khaled hamza is on a distinguished road
Lightbulb

I work at Cairo-West Power Station (EGYPT)

We Operate 2 MHI Steam Turbine, each one 350 MW, its specification is as follows:

TYPE: single reheat condensing tandem compound, two cylinder, double flow exhaust
Rated output: 350 MW
Speed: 3000 rpm


After completion of warming the turbine and piping by bypass system, we make (TURBINE RESET), and then Governors (GV) & Reheat Stop Valve (RSV) will open to provide steam flow For both HP & IP Turbine.

Then we make (Speed Up) by opening, Main Stop Valve (MSV) and Interceptor valve (ICV), Until after initial load of steam turbine is accomplished we make (Valve Transfer) that make (MSV) fully open And (GV) in control mode.
Attached Images
File Type: jpg vales.JPG (13.7 KB, 4 views)
__________________
http://science-hamza.blogspot.com
Reply With Quote
  #4 (permalink)  
Old 12-12-2011
PPF Member
New Person
 
Join Date: Dec 2011
Location: Fiji
Posts: 1
Rep Power: 0
Mariko is on a distinguished road
Default

magnificent submit, very informative. I'm wondering why the opposite experts of this sector don't notice this. You should continue your writing. I'm sure, powerplantforum.com have a huge readers' base already!
__________________
refrigerator repair
Reply With Quote
Reply

Bookmarks

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Subscribe to Power Plant Forum

All times are GMT -4. The time now is 02:18 PM.
Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.3.0