Reliability: Probability of not being forced out
of service when the unit is needed – includes forced outage hours (FOH) while in service, while on reserve shutdown and while attempt-ing to start normalized by period hours (PH)- units are %: Reliability = (1-FOH/PH) (100) FOH = total forced outage hours PH = period hours Availability: Probability of being available, independent of whether the unit is neededincludes all unavailable hours (UH) – normalized by period hours (PH) – units are %: Availability = (1-UH/PH) (100) UH = total unavailable hours (forced outage, failure to start, scheduled maintenance hours, unscheduled maintenance hours) PH = period hours Availability: Probability of being available, independent of whether the unit is neededincludes all unavailable hours (UH) – normalized by period hours (PH) – units are %: Availability = (1-UH/PH) (100) UH = total unavailable hours (forced outage, failure to start, scheduled maintenance hours, unscheduled maintenance hours) PH = period hours |
![]() |
| Bookmarks |
| Thread Tools | Search this Thread |
| Display Modes | |
|
|