Default S17 and EGV...still an issue?

The S17 and EGV issues was a hot topic many years back. The OEM recommended inner barrel bore plugs and software protection to avoid vortex bursting of the last stage stators. Is this still an issue? Any users seen blade distress even after all of the TILs were implemented?
Reply With Quote
  #2 (permalink)  
Old 06-10-2008
PPF Member
Power Regular
 
Join Date: Apr 2009
Posts: 54
Rep Power: 102
RStevens is on a distinguished road
Default RE: S17 and EGV...still an issue?

Good question, it must still be an issue since GE is offering the upgraded shrouded 17 segments, shorter EGVs in addition to a modified and larger diameter inner barrel to match. There is an aftermarket option out there which shrouds the S17 and shrouds the EGV which retains the existing inner barrel but requires machining to fit the new hardware. Has anyone see actual 17/EGV root cracking or even liberations?
Reply With Quote
  #3 (permalink)  
Old 11-03-2008
PPF Member
New Person
 
Join Date: May 2009
Posts: 3
Rep Power: 76
PeteS is on a distinguished road
Default RE: S17 and EGV...still an issue?

Our borescope vendor inspects for S17 and EGV distress. I believe they look for stepping, tip rubs/curles, and gaps. I dont think it would be as visible to see fretting or base vane wear unless its significantly notable from platform stepping. I really like the shouded designs but havent heard much about S17/EGv issues after GE implemented the counter bore plugs and software logic upgrade.
Reply With Quote
Reply

Bookmarks

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Subscribe to Power Plant Forum

All times are GMT -4. The time now is 11:59 PM.
Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.3.0