Power Plant Forum
You are here:
Go Back   Power Plant Forum > Steam Generators > Heat Recovery Steam Generators

Heat Recovery Steam Generators Forum for discussion on Heat Recovery Steam Generators regarding maintenance, operation, improvements, and more. This forum is open to any make and model Heat Recovery Steam Generators

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1 (permalink)  
Old 01-10-2011
PPF Member
New Person
 
Join Date: Oct 2010
Posts: 3
Rep Power: 40
powafo is on a distinguished road
Thumbs up General HRSG inspection preventative maintenance

Here are some HRSG inspection PM's to perfom on a regular basis.

• Gas Side
– Access Lanes (inlet duct, firing duct, SCR, between tube
Summary
bundles, stack)
– Crawl spaces under and above tube headers
• Exterior
– Casing hotspots, cracks
– Piping penetration seals
– Access door condition
– Foundations
• Steam/Water Side
– Steam Drums are the only non‐intrusive access to the
water/steam side in most HRSGs
Online or “Hot” Inspection
– HRSG inspection while unit is operating
– Ideal for finding hotspots, casing g p , g cracks, penetration seal failures
– Can check hot position of spring hangers
• “Extended Scope” offline inspection
– Depending on the age, quantity & severity of cycles and history of issues,
more intrusive inspection techniques may be best to quantify condition.
– Common techniques:
1. UT tubes and piping beyond spot checks (A Scan, Phased Array, or Shear Wave)
2. Dye Penetrant or Magnetic particle testing of suspect areas
3. Conventional and Digital X‐Ray (Radiography)
4. Eddy Current Testing
5. Piping Assessment
6. Hardness and Replication (P91)
7. Desuperheater removal & inspection
8. Borescoping
9. Tube samples

What is your HRSG inspection program and any additional suggestions? What is the inspection intervals?
Reply With Quote
  #2 (permalink)  
Old 02-09-2011
PPF Member
New Person
 
Join Date: Jan 2011
Location: Kirkland, WA
Posts: 5
Rep Power: 35
TinaT is on a distinguished road
Default HRSG Inspections

Great information.

I'm on an ASME committee where we will be writing up this type of information in a guideline for a Performance Test Code (PTC) document. We hope to be going out for some industry reviews soon.

If you're interested in being a reviewer, send me a PM.
-TinaT
Reply With Quote
Reply

Bookmarks

Tags
alstom, general electric, hrsg, inspections

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Subscribe to Power Plant Forum

All times are GMT -4. The time now is 11:42 PM.
Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.3.0