Power Plant Forum
You are here:
Go Back   Power Plant Forum > Instrumentation and Control Systems > Distributed Control systems

Distributed Control systems Discussion of DCS control systems such as Emerson Ovation, Metso, Siemens, Yamatake, Yokogawa, GE, etc.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1 (permalink)  
Old 01-22-2011
PPF Member
Power Rookie
 
Join Date: Dec 2010
Location: Egypt
Posts: 40
Rep Power: 55
khaled hamza is on a distinguished road
Lightbulb On/Off Control

On/Off Control

- Suppose a process operator has the task of holding the temperature, T, near the desired temperature, Td, while making sure the tank doesn't overflow or the level get too low. The question is how the operator would cope with this task over a period of time. He or she would manually adjust the hot water inlet valve (HV-1) to maintain the temperature and occasionally adjust the outlet valve (HV-2) to maintain the correct level in the tank.
- The operator would face several problems, however. Both indicators would have to be within the operator's view, and the manual valves would have to be close to the operator and easy to adjust.





- To make the operator's work easier, suppose we installed electrically operated solenoid valves in place of the manual valves, as shown in the next figure. We can also install two hand switches (HS-1 and HS-2) so the solenoid valves can be operated from a common location. The valves can assume two states, either fully open (on) or fully closed (off). This type of control is called two-position or on/off control.
- Assume for the moment that the level is holding steady and that the main concern is controlling temperature. The operator has been told to keep the temperature of the fluid in the tank at 100°F. He compares the reading of the temperature indicator with the selected set point of 100°F. The operator closes the hot water valve when the temperature of the fluid in the tank rises above the set point. Because of process dead time and lags the temperature will continue to rise before reversing and moving toward the set point. When the temperature falls below 100°F, the operator opens the hot water valve. Again, dead time and lags in the process create a delay before the temperature begins to rise. As it crosses the set point, the operator again shuts off the hot water, and the cycle repeats.






- This cycling is normal for a control system that uses on/off control. This limitation exists because it’s impossible for the operator to control the process exactly with only two options.

This on/off type of control can be expressed mathematically as follows:

e = PV – SP

In the on/off control mode, the valve is open valve when the error (e) is positive (+), and the valve is closed when e is negative (–).



__________________
http://science-hamza.blogspot.com
Reply With Quote
Reply

Bookmarks

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Subscribe to Power Plant Forum

All times are GMT -4. The time now is 11:23 PM.
Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.3.0